Reconstruction of "Rimi" store, Str. Dzelzavas 78, Riga
Customer: Bukoteks Ltd
Latvia
Start date: May 2018
Finish date: January 2019
Within the framework of the project, JSC “BMGS” plays a role of a subcontractor of bored piles installation.
For the needs of the object, there has been installed 60 units of bored piles with a length of 11 m and 99 units of piles with a length of 9.3 m. Altogether, total quantity of installed piles reaches up to 159 units, including 10 units of test piles. With a purpose to provide the best possible control quality and to identify significant cracks during the pile installation process, sonic integrity testing has been carried out.
For the object is located in a high density residential area (intersection of Str. Dzelzavas and Str. Ilukstes), during the whole construction process, the monitoring of surrounding buildings is being performed.
Reconstruction of “Rimi” on Str. Dzelzavas 78 is an essential part of “Rimi Latvia” modernization project, that is to be implemented throughout all 2018.