Reconstruction of shore protection part Smiltyne in Klaipeda State Seaport (I phase of works)

Customer: Klaipeda State Seaport Authority

Lithuania
Start date: October 2016
Finish date: July 2018

     The quay is designed for passenger ferry mooring. Total project length of the quay –  47 m; project depth: –5.20 m. During the reconstruction, the following works are performed – installation of the sheet pile wall and injection tie anchors; assembly of façade reinforced concrete slabs; concreting of the upper part of quay; construction of coatings and installation of mooring equipment.