Reconstruction of quays №1 and №2 in Klaipeda State Seaport

Customer: Klaipeda State Seaport Authority

Lithuania
Start date: September 2015
Finish date: August 2017

    Within the framework of the project the reconstruction of dolphins of quays №1 and №2 is being undertaken. The quays are designed for quays operator AB Klaipedos nafta oil product tankers mooring. Project depth: –14.00 m. During the reconstruction, the following works are performed – installation of steel pipes DN 1220mm; assembly of façade reinforced concrete slabs; dolphin concreting; repair of catwalks and complete dismantling of unexploited dolphins.